Skip to content
Al-Shaker for Scientific and Medical Supplies
Photos available on request

Reference: CLKDOC78

CLKDOC78 Fluorinated Heat-Transfer Liquid

Hydrofluoroether coolant (C4F9OC2H5) with zero ODP, low GWP and a -138 °C pour point, for semiconductor cold plates, immersion cooling and electronics reliability testing.

Key specifications

Chemical composition
C4F9OC2H5 (hydrofluoroether)
CAS number
163702-06-5
Molecular weight
264 g/mol
Purity
99.5 %
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

CLKDOC78 is a fluorinated liquid based on hydrogen fluoroether. It has zero ozone depletion potential, a GWP of 59 and a 0.77 year atmospheric lifetime, and is described as non-toxic, non-corrosive and non-flammable with high dielectric strength (above 25 kV at a 0.1 inch gap).

Boiling point is 76 °C, pour point -138 °C, liquid density 1.43 g/cm³, specific heat 1220 J/kg·K and thermal conductivity 0.069 W/m·K. Typical uses are semiconductor cold plate cooling, data center immersion cooling, avionics spray cooling and reliability testing of electronic components.

Specifications

Technical specifications

12 parameters

Composition

Chemical composition
C4F9OC2H5 (hydrofluoroether)
CAS number
163702-06-5
Molecular weight
264 g/mol
Purity
99.5 %

Physical

Boiling point
76 °C
Pour point
-138 °C
Liquid density
1.43 g/cm³
Specific heat capacity
1220 J/kg·K
Thermal conductivity
0.069 W/m·K

Safety

Ozone depletion potential
0
Global warming potential
59
Flash point
No flash point
Features

Key features

  • 01

    Zero ODP, low GWP

    Environmental and safety profile published.

  • 02

    High dielectric strength

    Above 25 kV (0.1 inch gap).

  • 03

    Wide liquid range

    Pour point -138 °C, boiling point 76 °C.

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.